West Gate Tunnel Project (Drainage)

West Gate Tunnel Project (Drainage)

ABC Civil Group are currently engaged with CPB JH JV on the West Gate Tunnel Project. ABC are providing extensive plant, labour and equipment to complete the entire drainage scope of works on the M80 Interchange and Princess Highway.

The scope of works includes installing over 5500 m of HDPE and RCP drainage pipes, ranging from 300 mm to 1200 mm in diameter and up to 5.5 m in depth. The works also include the landing and installation of manholes, strip drains, headwalls and existing pipe connections. The project is expected to take 2 years and will see many challenges and hurdles that will be overcome through collaboration and innovation amongst our employees, management and our reliable suppliers.

 

west-gate-tunnel-project

PROJECT FEATURES

5500 m of Drainage & 250 manholes
2 Year Project
Extensive Wet Hire of Plant & Equipment