ABC were a major contributor in the construction of the Eastlink Motorway. ABC were involved with the construction of the Eastlink over a period of two years, providing a skilled labour force of 40 strong, including various plant operators, truck drivers and labourers. Various plant and equipment used throughout the project included various sized excavators and multiple vacuum trucks.

ABC Civil Group were responsible for the installation of power and communications conduits inclusive of links and roping. This involved ABC installing over 50km of 4x32mm subduct, which was hauled from Springvale Rd to Frankston.

eastlink

PROJECT FEATURES

40+ Employees
50km Conduit Installed
2 Years