Upgrade of new M80 interchange at the western end of the West Gate Tunnel Project. ABC were contracted to undertake all drainage works in this zone

The scope of works includes installing over 5500m of HDPE and RCP drainage pipes, ranging from 300 mm to 1200 mm in diameter and up to 5.5m in depth. The works also include the landing and installation of over 250 manholes, strip drains, headwalls and existing pipe connections. The project is expected to take 2 years and will see many challenges and hurdles that will be overcome through collaboration and innovation amongst our employees, management, and our reliable suppliers. As well as the packaged works, ABC are also providing extensive wet and dry plant hire to the project.

wgtp-m80-interchange

PROJECT FEATURES

5500 m of Drainage & 250 manholes
2 Year Project
Extensive Wet Hire of Plant & Equipment