Sunset Drive Pump Station
Upgrade of Wangaratta’s stormwater network on Sunset Drive to manage flooding in major storm events, involving the live connection to existing services and a new pump station to manage high flows
ABC completed works on behalf of RCoW for the supply and Installation of a new 4m deep wet well, electrical swithcboard and SCADA integration This critical project was required to stop flooding in major stormwater events, and was constructed well within the contract duration timelines. This multi-disciplinary project provided great benefit to the community, was delivered well within budget limitations and to high quality standards.