Leongatha Raw Water Upgrade

Leongatha Raw Water Upgrade

Removal of existing 450 MSCL above-ground raw water main and replacement with 650m of OD630 PE

ABC completed works on behalf of South Gippsland Water, contructing over 600 m of OD630 HDPE pipeline.

  • Installation of 647m of OD630 PE100 SDR11 pipe by open cut excavation
  • Supply and install five air valve arrangements and five scour valve assemblies
  • Connection of the replacement pipeline to the existing raw water pipelines at each end
  • Removal of approximately 230m of above ground DN450 MSCL pipeline